Day 196…11/01/11

So the blog’s been quiet for a while, not that it’s been quiet on the building front, but there’s not really a lot to be reported. The intricacies are underway- fixing of electrical sockets, roof soffits, preparing for window frames etc. There’s been heavy banging over the last few days as the builders prepare the floor for the screed which in turn is a base for the vinyl and tiles. Snagging (fault finding) begins on a more detailed level, and hopefully the windows will be in by the end of the month. Then it’s down to the final fix and decoration.

Advertisement
This entry was posted in Uncategorized and tagged , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s