So the blog’s been quiet for a while, not that it’s been quiet on the building front, but there’s not really a lot to be reported. The intricacies are underway- fixing of electrical sockets, roof soffits, preparing for window frames etc. There’s been heavy banging over the last few days as the builders prepare the floor for the screed which in turn is a base for the vinyl and tiles. Snagging (fault finding) begins on a more detailed level, and hopefully the windows will be in by the end of the month. Then it’s down to the final fix and decoration.
Advertisement





